Project Spotlight
UNC Medical Education Building
- FiberForce 750
- Slabs on Metal Decks
- Libraries, Schools
- Exterior, Interior
Scope of Work
The original design called for 6×6-W2.1xW2.1 welded wire reinforcement (WWR) reinforcement. Raleigh East Concrete Construction requested an alternative using macrofibers instead of WWR. FullForce collaborated with Chandler Concrete and LHC Structural Engineers to develop a macrofiber solution consisting of 4 lbs/yd³ FiberForce 750 synthetic macrofiber that met the requirements of the Steel Deck Institute’s C-2017 standards and satisfied all parties involved.
By using FiberForce 750, the contractor adhered to a tight schedule at a competitive cost. The use of fiber reinforcement enhanced job site safety by eliminating trip hazards associated with WWR and rebar. It also freed up space that would have been needed for WWR storage and staging. Additionally, eliminating the need to place, chair, tie, and inspect the WWR significantly improved the overall project efficiency.
-
Location
Chapel Hill, NC
-
Date
December 2021
-
Owner
-
Area
-
Volume
1,500 yd3
-
Engineer
LHC Structural Engineers
-
General Contractor
T.A. Loving Company
-
Concrete Contractor
Raleigh East Concrete Construction
-
Ready-Mix Concrete Supplier
Chandler Concrete
-
Location
Chapel Hill, NC
-
Date
December 2021
-
Volume
1,500 yd3
-
Architect
Flad Architects
-
Engineer
LHC Structural Engineers
-
General Contractor
T.A. Loving Company
-
Concrete Contractor
Raleigh East Concrete Construction
-
Ready-Mix Concrete Supplier
Chandler Concrete