Project Spotlight
Sterling at Stonecrest
- FiberForce 300
- Slabs on Ground
- Multi-Family
- Exterior
Scope of Work
Sterling at Stonecrest used FiberForce 300™ at a dosage rate of 1.5 lb/yd3 in lieu of 10-gage welded wire mesh. The fiber was used in the walking paths and sidewalks, totaling to 1,000 yd3 of concrete. The concrete has a broom finish in some areas and an exposed finish in other areas. By replacing the 10-gage welded wire mesh with FiberForce 300™, the concrete contractor was able to save valuable time and money.
-
Location
Smyrna, TN
-
Date
Spring 2019
-
Owner
-
Area
-
Volume
1,000 yd3
-
Engineer
-
General Contractor
Los Pumas
-
Concrete Contractor
-
Ready-Mix Concrete Supplier
Irving Materials, Inc. (iMi)
-
Location
Smyrna, TN
-
Date
Spring 2019
-
Volume
1,000 yd3
-
General Contractor
Los Pumas
-
Ready-Mix Concrete Supplier
Irving Materials, Inc. (iMi)