Project Spotlight

Orange County Northern Campus Detention Center

Scope of Work

For the Orange County Northern Campus Detention Center, located in Hillsborough, NC, FiberForce 750TM, was used to replace 6×6-W2.9 x W2.9 in slab-on-grade and the WWF in composite metal decks. The primary motivation for using fiber was for cost-savings and time-management benefits.

Additional benefits of using FiberForce 750TM to replace traditional steel reinforcement include:

  • Crack-width control for concrete due to shrinkage and temperature restraint
  • Redistribution of shrinkage-stresses in concrete
  • Increases in concrete durability, including impact and abrasion resistance, fatigue strength, and ductility
  • Location

    Hillsborough, NC

  • Date

    May 2020

  • Owner

    Orange County, NC

  • Area

  • Volume

    1,600 yd3

  • Engineer

    Moseley Architects

  • General Contractor

  • Concrete Contractor

    Select Concrete

  • Ready-Mix Concrete Supplier

    Chandler Concrete

  • Location

    Hillsborough, NC

  • Date

    May 2020

  • Owner

    Orange County, NC

  • Volume

    1,600 yd3

  • Engineer

    Moseley Architects

  • Concrete Contractor

    Select Concrete

  • Ready-Mix Concrete Supplier

    Chandler Concrete