Project Spotlight

Leading Edge Jet Center

Scope of Work

Leading Edge needed a new, larger hangar for private aircraft storage with upgrades that included a meeting facility with outdoor space for events as well as a new reception area and lounge area for pilots. The slab on grade areas’ original design included an 8” perimeter slab with #5 rebar at 12” on center mid-depth. The remaining larger portion of the slab was 11” with #5 rebar at 12” on center, both top and bottom. Sunwest Builders, Bend Concrete, and Knife River wanted to value engineer the slab, and FullForce was able to offer a complete replacement for the perimeter slabs with 4 lb/yd3 of FiberForce 750™ macrofiber and a hybrid solution for the 11” slab by replacing the top layer of #5 rebar with 7 lb/yd3 of FiberForce 750™. FullForce was able to offer assistance to the ready-mix supplier on the mix design to maintain a pumpable and workable mix.

  • Location

    Redmond, OR

  • Date

    August 2022

  • Owner

    Leading Edge

  • Area

    32,000 ft2

  • Volume

  • Engineer

    Walker Structural Engineering

  • General Contractor

    Sunwest Builders

  • Concrete Contractor

    Bend Concrete Service Company

  • Ready-Mix Concrete Supplier

    Knife River

  • Location

    Redmond, OR

  • Date

    August 2022

  • Owner

    Leading Edge

  • Area

    32,000 ft2

  • Architect

    BBT Architects

  • Engineer

    Walker Structural Engineering

  • General Contractor

    Sunwest Builders

  • Concrete Contractor

    Bend Concrete Service Company

  • Ready-Mix Concrete Supplier

    Knife River