Kingvale Bridge Deck Phase I

Scope of Work

Cal-Trans is rehabbing the I-80 corridor over the Sierra Nevada Mountains. They are repaving the highway and rebuilding bridges to add new lanes. In Phase I, they poured two separate bridge decks roughly 1/4 mile apart. The challenges came from having to do this in the mountains on uneven surfaces, while not blocking the traffic on I-80 as it is the lifeblood of Nevada. The concrete was dosed with FiberForce 600 at one bag per yard. Each bridge deck used roughly 73 yd3 each.

  • Location

    Kingvale, CO

  • Date

    Ongoing Project

  • Owner

    CalTrans

  • Area

  • Volume

    150 yd3

  • Engineer

  • General Contractor

    Teichert Construction

  • Concrete Contractor

    MCM Construction

  • Ready-Mix Concrete Supplier

    Hansen Bros. Enterprises

  • Location

    Kingvale, CO

  • Date

    Ongoing Project

  • Owner

    CalTrans

  • Volume

    150 yd3

  • General Contractor

    Teichert Construction

  • Concrete Contractor

    MCM Construction

  • Ready-Mix Concrete Supplier

    Hansen Bros. Enterprises

We have not had any complaints about balling since we started using FullForce for bridge decks. We couldn’t be happier with your product.”