Project Spotlight

I-25 – Hwy 119 Box Culvert

Scope of Work

FiberForce 650™ was used on the box culvert under I-25 near the Hwy 119 exit. The roughly 10’ tall and 12” thick CDOT structure needed to be cast in place concrete that was highly durable with minimal cracking as an interstate highway goes over it. Other mixes have been tried but are difficult to produce in the mass market. The Class D mix has been a staple for many years and works well but is enhanced greatly by the addition of 4#/cy of macrofiber. Much of the shrinkage and temperature cracking is eliminated. In an environment where there will be foot traffic, crack reduction or elimination is important.

  • Location

    Firestone, CO

  • Date

    October 2023

  • Owner

    Colorado Department of Transportation

  • Area

  • Volume

    800 yd3

  • Engineer

  • General Contractor

  • Concrete Contractor

  • Ready-Mix Concrete Supplier

    Raptor Materials

  • Location

    Firestone, CO

  • Date

    October 2023

  • Owner

    Colorado Department of Transportation

  • Volume

    800 yd3

  • Concrete Consultant

    Zak Dirt

  • Ready-Mix Concrete Supplier

    Raptor Materials

This concrete with the fiber looks really good; it is a great product, and there are no cracks at all, anywhere.”