Project Spotlight

Gateway Development

Scope of Work

The Gateway Development project consists of three warehouses totaling nearly 900,000 ft2 of interior slabs. An Ashford densifier was originally specified for the slabs, but David Venegas of Vemac Engineering proposed DuraForce(t) as an alternative. The DuraForce(t) densifier plus cure and seal allowed Venegas to speed-up the project and save money for the owner. The DuraForce(t) is a one-time application whereas the Ashford products requires 2+ applications and a curing product added later on. Venegas also noted that DuraForce(t) worked well with the bond breakers specified for the tilt- up, giving the slab a “buttery” texture that made it easy to lift and clean the tilt-up walls.

  • Location

    El Paso, TX

  • Date

    2024

  • Owner

    Provident Realty

  • Area

    900,000 ft2

  • Volume

    16,700 yd3

  • Engineer

    LJB Engineering

  • General Contractor

    Harvey Builders

  • Concrete Contractor

    Vemac

  • Ready-Mix Concrete Supplier

    Jobe Materials

  • Location

    El Paso, TX

  • Date

    2024

  • Owner

    Provident Realty

  • Area

    900,000 ft2

  • Volume

    16,700 yd3

  • Architect

    Powers Brown Architecture

  • Engineer

    LJB Engineering

  • General Contractor

    Harvey Builders

  • Concrete Contractor

    Vemac

  • Ready-Mix Concrete Supplier

    Jobe Materials