Scope of Work

For the 5” slab, the initial design called for number #4 rebar at 24” spacing. Martin Marietta Materials reached out to the FullForce engineers to develop a macrofiber alternative. A submittal package for an alternative to the rebar included a 4 lb dosage rate of FiberForce750™, our macro synthetic fiber, was approved. The owner of Elk Ridge Builders and the concrete finishers were very impressed with the finishability of the macro fiber.

  • Location

    Laramie, WY

  • Date

    Spring 2019

  • Owner

    Elk Ridge Builders

  • Area

  • Volume

    200 yd3

  • Engineer

    Elk Ridge Design

  • General Contractor

  • Concrete Contractor

    Hardrock Concrete Placement Co.

  • Ready-Mix Concrete Supplier

    Martin Marietta Materials

  • Location

    Laramie, WY

  • Date

    Spring 2019

  • Owner

    Elk Ridge Builders

  • Volume

    200 yd3

  • Architect

    Elk Ridge Design

  • Engineer

    Elk Ridge Design

  • Concrete Contractor

    Hardrock Concrete Placement Co.

  • Ready-Mix Concrete Supplier

    Martin Marietta Materials