The Caddy Road Storage Facility required 50 lb/yd³ of Type 1 steel fiber for the slab on grade. FullForce supplied FiberForce T1-60 fiber, which was batched for both the Fuquay-Varina and Durant Park plants. Both plants received a FullForce conveyor for the project. The slab was poured in two separate pours of 550 yd³ each, five days apart.

Jim Yancey oversaw operations at the Fuquay-Varina plant, while Scott Barbour, P.E. managed the Durant Park plant pour. Concrete Supply batched 9.7 yd³ per truck, with 44 lb FiberForce bags evenly distributed at 11 bags per truck.

  • Location

    Garner, North Carolina

  • Date

    Ongoing

  • Owner

  • Area

  • Volume

    1,100 yd3

  • Engineer

    Kimley-Horn

  • General Contractor

    Metrolina Builders, Inc.

  • Concrete Contractor

    Shumis Concrete Inc.

  • Ready-Mix Concrete Supplier

    Concrete Supply Co.

  • Location

    Garner, North Carolina

  • Date

    Ongoing

  • Volume

    1,100 yd3

  • Engineer

    Kimley-Horn

  • General Contractor

    Metrolina Builders, Inc.

  • Concrete Contractor

    Shumis Concrete Inc.

  • Ready-Mix Concrete Supplier

    Concrete Supply Co.

“I appreciated the on-site support from FullForce. I certainly didn’t expect that, but I do appreciate it. It went great!”

Mike Tysinger
Concrete Supply, Regional Manager