Scope of Work

This project was a new 50,000 ft2 warehouse tilt building for Arizona State University with a 6″ thick slab and 4 lb/yd3 of our FiberForce 750™ synthetic macrofiber. Fibers were specified for temperature and shrinkage control over a vapor barrier and 4″ aggregate base course.

  • Location

    Tempe, AZ

  • Date

    December 2020

  • Owner

    Arizona State University

  • Area

    50,000 ft2

  • Volume

  • Engineer

    Advanced Structural Engineering

  • General Contractor

  • Concrete Contractor

    Hardrock Concrete Placement Co.

  • Ready-Mix Concrete Supplier

    CEMEX

  • Location

    Tempe, AZ

  • Date

    December 2020

  • Owner

    Arizona State University

  • Area

    50,000 ft2

  • Engineer

    Advanced Structural Engineering

  • Concrete Contractor

    Hardrock Concrete Placement Co.

  • Ready-Mix Concrete Supplier

    CEMEX