Scope of Work

Sterling at Stonecrest used FiberForce 300™ at a dosage rate of 1.5 lb/yd3 in lieu of 10-gage welded wire mesh. The fiber was used in the walking paths and sidewalks, totaling to 1,000 yd3 of concrete. The concrete has a broom finish in some areas and an exposed finish in other areas. By replacing the 10-gage welded wire mesh with FiberForce 300™, the concrete contractor was able to save valuable time and money.

  • Location

    Smyrna, TN

  • Date

    Spring 2019

  • Owner

  • Area

  • Volume

    1,000 yd3

  • Engineer

  • General Contractor

    Los Pumas

  • Concrete Contractor

  • Ready-Mix Concrete Supplier

    Irving Materials, Inc. (iMi)

  • Location

    Smyrna, TN

  • Date

    Spring 2019

  • Volume

    1,000 yd3

  • General Contractor

    Los Pumas

  • Ready-Mix Concrete Supplier

    Irving Materials, Inc. (iMi)