Project Spotlight
Sierra Pacific Dry Kilns
- DuraForce(t), FiberForce 750
- Slabs on Ground
- Infrastructure
- Interior
Scope of Work
The intention of this project was to replace asphalt in and around the kilns. The large metal carts that transport the wood in and out will come off the rails periodically and cause major damage to the asphalt. The owners had been replacing the asphalt every 10 years. The FullForce full system approach is meant to save money upfront by replacing rebar and rebar labor as well as providing long-term cost-savings with a denser concrete.
-
Location
Burlington, WA
-
Date
Spring 2024
-
Owner
Sierra Pacific Industries
-
Area
-
Volume
2,500 yd3
-
Engineer
-
General Contractor
K.C. Excavating
-
Concrete Contractor
Kaaland Construction
-
Ready-Mix Concrete Supplier
Miles Sand and Gravel
-
Location
Burlington, WA
-
Date
Spring 2024
-
Owner
Sierra Pacific Industries
-
Volume
2,500 yd3
-
General Contractor
K.C. Excavating
-
Concrete Contractor
Kaaland Construction
-
Ready-Mix Concrete Supplier
Miles Sand and Gravel