Project Spotlight

City of El Mirage Wastewater Treatment Plant

Scope of Work

This project is a heavy equipment wash rack drainage system designed to remove dirt, grease, and oil from the wash water prior to it entering the water treatment plant. Team Fishel and FullForce paired up to value engineer this heavy equipment wash rack slab which was initially designed with traditional rebar reinforcement. Instead, Team Fishel and the City of El Mirage added 5.5 lb/yd3 of FiberForce 750™ macrofiber to help with crack control as well as impact and abrasion resistance in the slab.

  • Location

    El Mirage, AZ

  • Date

    April 2020

  • Owner

    City of El Mirage

  • Area

    1,400 ft2

  • Volume

  • Engineer

  • General Contractor

  • Concrete Contractor

    Team Fishel

  • Ready-Mix Concrete Supplier

    CalPortland

  • Location

    El Mirage, AZ

  • Date

    April 2020

  • Owner

    City of El Mirage

  • Area

    1,400 ft2

  • Concrete Contractor

    Team Fishel

  • Ready-Mix Concrete Supplier

    CalPortland